Two extensions to the existing higher secondary school. Centrum Pæle delivered energy piles to the school’s geothermal system that provides heating and/or cooling to half of the new south wing.
We delivered a total of 8,000 linear metres of piles in the dimensions 30x30 and in lengths of 12 to 17 metres.